A day-by-day look at what actually happens between signing a Makasa quote and handing keys to your first tenant — and where a DIY furnishing would double the time.
Ask any landlord who's furnished their own place: the actual assembly is only about a third of the work. The rest is coordination — waiting for deliveries, chasing delivery slots, running back to the store for the one missing item, and finding an hour on a Saturday when the elevator isn't broken.
Makasa's whole operational advantage is that this coordination is *their* job, not yours. Here's what a typical 15-day timeline actually looks like.
Day 1 — the call
You submit a quote request on the site (5 minutes) or on the phone with an advisor. You describe the property: square meters, number of bedrooms, target tenant profile (student, young professional, family, tourist). You get an estimated pack recommendation and a rough price the same day.
Day 2-3 — final quote & personalization
The advisor sends you the full itemized quote — sometimes with a second pack option so you can compare price points. If you want to swap the sofa colour, upgrade the mattress, or add a bar cart, that's when it happens. You sign electronically.
Day 4 — order placed
The Makasa operations team places all the individual orders across their supplier network. This is invisible to you — but it's the day where a DIY landlord would have started their first hour-long argument with the IKEA delivery slot system.
Day 5-12 — production and consolidation
The items ship from various suppliers to Makasa's regional warehouse — not directly to you. This is one of the quiet advantages of the model: instead of six separate deliveries you have to be home for, everything is consolidated at their end and shows up in a single truck.
Day 13 — quality check
Every item is unboxed and inspected at the warehouse. Damaged items get replaced *before* they arrive at your property, not after. This is where DIY furnishing loses whole weekends: a warped table has to go back to the store, and the new one takes another week.
Day 14 — delivery scheduled
You get a call with a two-hour delivery + install window. If you're not going to be there, Makasa can pick up keys from your notary, your agent, or a keybox — many long-distance landlords never even step foot in the apartment on install day.
Day 15 — the install
A dedicated team arrives with the whole pack. They:
- Unload from the truck.
- Assemble every piece.
- Position the furniture per the ambience plan.
- Make the bed with the linen included.
- Set up the lighting.
- Take away all cardboard, packaging, and any old furniture.
- Send you photos of the finished apartment.
You leave in the morning. The apartment is rent-ready by the end of the afternoon.
The DIY comparison
A typical DIY furnishing of the same T2 takes 5-6 weekends spread across 4-6 weeks, plus roughly 40-50 hours of driving, assembly, and cleanup. If your time is worth 30 €/hour (and it should be worth more), that's 1 200-1 500 € of your own labour on top of the raw furniture cost.
The Makasa premium over raw IKEA is significantly smaller than that hidden labour cost — and you get a designer-curated result, not a Frankenstein of three shopping trips.